雅虎香港 搜尋

搜尋結果

  1. www.bd.gov.hk › doc › enChapter 4 - BD

    The purposes of a condition survey are to: understand current conditions and degree of deterioration of the building; identify the causes of deterioration so that appropriate repair methods can be specified; assess the extent of works, prepare for budget, plan the implementation priorities and program; and.

    • 200KB
    • 6
  2. www.bd.gov.hk › doc › tcwww.bd.gov.hk

    www.bd.gov.hk

  3. I would like to announce the promulgation of the Code of Practice for Site Supervision 2009 (2021 Edition) (the Code), incorporating the corrigenda and amendments issued in May 2015, June 2016, May 2019, and September and December 2020.

  4. It shall be taken to include but not limited to the following: soil fill, waterproofing and drainage system for gardening, greenery or planting. 2.1.2 The weights of tanks and other receptacles shall be considered as dead loads. The contents of tanks and receptacles shall be considered as imposed loads.

  5. Guidance. The following factors should be considered for complying with Performance Requirements B1 to B7: Use Classification of the building; . Occupant capacity, nature, location and awareness; . Fire hazard, its potential growth and duration; . Building height; . Building area and fire compartment area; .

  6. Buildings Department | 屋宇署

  7. Composite walls involving plasterboard systems should be constructed in accordance with the manufacturer’s specifications. The assembled products should be tested in accordance with BS EN 1364-1:1999, Fire resistance tests for non-loadbearing elements. Walls to demonstrate the required FRR.