雅虎香港 搜尋

搜尋結果

  1. 通過屋宇署資格預審的顧問公司名單(2024年-2025年)(只提供英文版本地址). 註:. 名單有效期由2024年6月1日至2025年5月31日(包括首尾兩天). 先達測量師行有限公司. Unit A, 13/F. Hing Yip Centre, 31 Hing Yip Street, Kwun Tong, Kowloon. 奕康有限公司. 12/F Grand Central Plaza ...

  2. www.bd.gov.hk › doc › tcwww.bd.gov.hk

    www.bd.gov.hk

  3. www.bd.gov.hk › doc › enChapter 4 - BD

    The purposes of a condition survey are to: understand current conditions and degree of deterioration of the building; identify the causes of deterioration so that appropriate repair methods can be specified; assess the extent of works, prepare for budget, plan the implementation priorities and program; and.

    • 200KB
    • 6
  4. 5.3.3.1 Natural frequencies Structural analysis programmes should be used to determine the natural frequencies of vibration of buildings and structures to mitigate excessive horizontal and vertical vibration. Empirical formulae can also be used for approximated vibration analysis of typical and regular buildings.

  5. For the purpose of the Building (Planning) Regulation 41D, this Subsection specifies the design and construction requirements of EVA serving buildings erected or to be erected on virgin sites. For the avoidance of doubt, the requirements in this Subsection should also apply to all subsequent redevelopments on virgin sites.

  6. Layman's Guide on Compliance with Fire Safety Directions

  7. To give a preliminary concept of what “minor works” (“MW”) are, the 118 items are illustrated in tables by grouping those with the same or similar substance of works together. Following is a demo in relation to the supporting structure / frame for air-conditioner and water cooling tower.