雅虎香港 搜尋

搜尋結果

  1. 2024年1月11日 · The technical specifications of the solid fence wall for validation and corresponding minor works items are listed in Part 4 of Schedule 3 of the Building (Minor Works) Regulation (B (MW)R). The works must be in existence or completed before 1 September 2020. Solid fence wall on-grade. The prescribed building or building works item. 6.

  2. BD GR/1-50/84 (V) This PNAP is previously known as PNAP 172 First issue May 1995 Last revision August 2019 This revision March 2023 (AD/NB1) (Paragraph 6 and Footnote 1 amended) Appendix A (PNAP APP-67) OTTV Summary Sheet Address : ...

    • 166KB
    • 4
  3. 守則及參考資料. 守則,設計手冊及指引. 小型工程監管制度之技術指引. 最近修訂日期: 2024年1月11日. 分享. 說明. 目錄. 第1章. 引言.

  4. FEFF76EE9304 - BD

  5. Sampling rate should be at least 1% or 5 numbers, whichever is more, of each type and size of the assemblies of T bolts with cast-in channels installed. The strength tests should be carried out by a recognised laboratory independent of the contractor. Each representative assembly of T bolts with cast-in channels should be tested for tensile ...

  6. General Requirements for Temporary steel platform erected on slopes/retaining walls for the construction of Foundations Works. You have to ensure that the requirements of chemical composition and mechanical properties appropriate to the type of steel used have been complied with. You are reminded that the temporary piling system now approved ...

  7. For investigation of dilapidated building or drainage works, an Authorized Person (AP) should be appointed to coordinate and carry out the investigation on the structural conditions and defects of the building or drainage system. The AP would submit to the BD an assessment report on the conditions of the building.