搜尋結果
其他比賽
- 2nd進球數目19th
- 2nd助攻19th
- 3rd射球10th
- 1st撲救1st
- 19th黃牌9th
- 12th紅牌17th
空調機凝結水的排放. 建築事務監督認為,建築物的地面水排水系統應包括妥善的空調機凝結水排放系統。. 因此,排水設施圖則須標示凝結水排放系統,否則,根據《建築物條例》第28(1) 條,有關圖則會不獲批准。. 2. 如現存建築物尚未裝設空調機凝結水排放系統,你們 ...
Such EVA should have a minimum width of 7.3m; for Use Classification 5a, the EVA should comply with the requirements of thoroughfares in Clause B20; for a building of any other types of Use Classifications, the EVA should serve at least one major façade of the building complying with Clause D22.2(e). Such EVA should have a minimum width of 6m;
For investigation of dilapidated building or drainage works, an Authorized Person (AP) should be appointed to coordinate and carry out the investigation on the structural conditions and defects of the building or drainage system. The AP would submit to the BD an assessment report on the conditions of the building.
- 2MB
- 34
Categorization of “Minor Works”. To give a preliminary concept of what “minor works” (“MW”) are, the 118 items are illustrated in tables by grouping those with the same or similar substance of works together. Following is a demo in relation to the supporting structure / frame for air-conditioner and water cooling tower.
Created Date 5/3/2011 10:53:51 AM
Strength tests on a representative number of assemblies of T bolts with cast-in channels should be carried out as directed by the Registered Structural Engineer to verify the performance and workmanship of the T bolts with cast-in channels.
PPA/109 specifies various fire safety requirements for facilities that require a Public Entertainment Licence to operate. The requirements on decorative and finishing materials in PPA/109 are: All decorative materials including curtains, draperies and other textile hangings shall be of fire-resistant fabric and shall conform with British ...