lpm project hong kong 相關
廣告上個月有 超過 1 萬 名用戶曾瀏覽 horizonhotels.com.hk
位於九龍核心地段,毗鄰匯集購物、消閒和文化藝術的尖沙咀,讓生活節奏時刻緊貼香港的繁華脈搏。 交通便利,鄰近港鐵尖沙咀、紅磡及黃埔站、海底隧道及碼頭,酒店更提供穿梭巴士服務.
搜尋結果
2023年11月7日 · Until 2010, the work (which was implemented under a Landslip Preventive Measures Programme) focused on substandard man-made slopes that posed the greatest landslide risk in Hong Kong. Given more than 40 years of sustained efforts, the landslide risk
- GEO Publication No. 1/2011 - CEDD
Report Title : Technical Guidelines on Landscape ...
- Landslip Prevention and Mitigation - CEDD
Since 1977, the Geotechnical Engineering Office has ...
- The Landslip Prevention and Mitigation Programme (LPMitP) - CEDD
This 10-year Extended LPM Project further boosted the ...
- Summary of Active LPM Works Contracts under the Landslip Prevention and Mitigation Programme (LPMitP) - CEDD
Landslip Prevention and Mitigation Programme, 2017, ...
- GEO Publication No. 1/2011 - CEDD
The 10-year Extended LPM Project retrofits high-priority substandard man-made slopes in the Government's Catalogue of Slopes affecting developments and major roads, in accordance with a risk-based priority ranking system, to enhance public safety and minimise disruptions to the community due to serious landslides.
其他人也問了
What is extended LPM project?
What is the LPM Programme?
What is the 10-year extended LPM project?
Will the extended LPM project reduce the risk posed by old man-made slopes?
In 2010, the Government launched a Landslip Prevention and Mitigation Programme (LPMitP) to dovetail with the LPMP so as to contain the landslide risks in Hong Kong within the ALARP level. The target annual output of the LPMitP is to
improve slope safety in Hong Kong, the 10-year Extended LPM Project was launched in 2000 on completion of the 5-year Accelerated LPM Project. This 10-year Extended LPM Project deals with old man-made slopes in the New Catalogue of Slopes which was
Our established geotechnical engineering expertise is one of the initial pair of consultants under the Landslip Preventive Measures (LPM) Programme in 1992 and the subsequent Landslide Prevention and Mitigation (LPMit) Programme in 2010 for man-made slope/retaining wall stabilisation and hazard assessment and mitigation for natural terrain hills...