雅虎香港 搜尋

搜尋結果

  1. 其他人也問了

  2. 2012年9月23日 · Setting out在土木或建築有兩個意思: 如果係測量, 即係代表將預先知道坐標的位置,用測量鏡在現場開返出來 如果係Building, 即係代表大樓裡的尺寸,包括牆身,房間,甚至廁所坐廁的位置 Setting out plan應該係講緊building圖上的一個Layout Plan

    • Methods of Setting Out Survey
    • Setting Out Survey Works Also Include
    • Setting Out Tools and Equipment
    Setting out buildings by coordinates
    Setting out with theodolite and level
    Checking verticality
    Setting out and alignment in steel-framed buildings

    Computations and setting out Methods for: 1. Simple Circular Curves 2. Compound Curves 3. Reverse curves 4. Transition curves 5. Vertical curves 6. Setting out of horizontal alignment 7. Setting out of vertical alignment 8. Setting out of cross-sections 9. Setting out of bends

    Pegs
    Tape measure/measuring wire
    Ranging rods
    Triangle sets
  3. 2024年2月7日 · In the construction of buildings, setting out is the critical first step on the path to successful construction. This process involves translating architectural plans onto the designated building site, and carefully identifying the exact locations and dimensions of foundations, walls, and other structural elements.

  4. The process of setting out involves transferring design information from plans and drawings to the construction site, using a variety of tools and techniques to ensure accuracy and precision. The first step in setting out is to establish a grid or framework for the construction site.

  5. The objective of a site layout is to provide a safe and economical flow of materials and workers. The absence of appropriate construction site layout leads to an incorrect designation of location for materials and machinery, as a result, double or triple handling of materials would be required.

  6. Setting out. BUILD. RIGHT. BEFORE EXCAVATIONS START, THE PROPOSED BUILDING MUST BE SET OUT ON THE SITE. GETTING THIS WRONG CAN PROVE VERY EXPENSIVE, SO HERE ARE A FEW POINTERS. ADAPTED FROM BRANZ HOUSE BUILDING GUIDE. boundary. 1500 mm. boundary. peg. 2800 mm. proposed building boundary. Figure 1. Clear set-out with single ofset dimensions.

  7. 2016年8月5日 · Setting out ” is the process of locating points for columns, site boundary level, pile position and other necessary structural parts according to the construction drawing. Errors should be avoided because the whole structure will be build based on the respective setting out.

  1. 其他人也搜尋了