雅虎香港 搜尋

搜尋結果

      • The Integrated Waste Management Facilities Phase 1 (IWMF1), which adopts advanced incineration treatment as the core technology, can reduce the volume of waste and generate electricity through heat recovery.
      www.info.gov.hk/gia/general/202101/20/P2021012000273.htm
  1. 其他人也問了

  2. The Integrated Waste Management Facilities Phase 1 (I∙PARK 1), which adopts advanced incineration treatment as the core technology, can reduce the volume of waste and generate electricity through heat recovery.

    • From 9:00 to 12:00; 13:00 to 17:00
    • Closed
    • From 9:00 to 12:00
  3. 綜合廢物管理設施第1期將會採用先進的科技和污染控制設備,確保排放的煙氣符合香港和歐盟委員會的廢物焚化設施排放上限以保護環境和公眾健康,當中氮氧化物的排放標準更較歐盟的排放標準為嚴格。 我們會分別在石鼓洲、長洲及南大嶼設立空氣監測站,提供當地空氣質素的客觀數據以確保綜合廢物管理設施第1期的運作不會影響周圍環境。 我們將以煙氣排放限值的百份之九十五定立行動水平以作預警,當煙氣排放達至行動水平時,我們會按預先制定的應變計劃採取相應行動,包括馬上停止輸入垃圾到焚化爐及準備關閉焚燒系統。 廢物運輸. 都市固體廢物於現時的港島東廢物轉運站、港島西廢物轉運站及西九龍廢物轉運站經壓縮裝進密封的貨櫃後,會以專用的貨櫃船運送到比鄰石鼓洲的人工島。 綜合廢物管理設施第1期合約.

  4. 2017年11月27日 · Integrated Waste Management Facilities Phase 1 KEPPEL SEGHERS – ZHEN HUA JOINT VENTURE 19/F, China Harbour Building, 370 – 374 King's Road, North Point, Hong Kong Design-Build, plus 15-year Operation Contract $31,398.1M

  5. The Integrated Waste Management Facilities (IWMF) aims to substantially reduce the bulk size of mixed MSW and to recover useful resources. It will minimize the landfilling of waste significantly, thereby extending the useable life of landfills and their extensions in Hong Kong.

    • integrated waste management facilities phase 11
    • integrated waste management facilities phase 12
    • integrated waste management facilities phase 13
    • integrated waste management facilities phase 14
    • integrated waste management facilities phase 15
  6. The Environmental Protection Department (EPD) Contract No. EP/SP/66/12, “Integrated Waste Management Facilities (IWMF) Phase 1”, was awarded to Keppel Seghers–Zhen Hua Joint Venture (the JV) in November 2017 under a design-build-operate (DBO

  7. This paper aims to present the latest progress of the Integrated Waste Management Facilities (“IWMF”) Phase 1 project and consult members on the architectural design of the IWMF Phase 1.

  8. 2011年5月11日 · PP-348/2008 - Integrated Waste Management Facilities. Study Brief Issued or DEP's decision on permission to apply directly for permit. ESB-184/2008 - Development of the Integrated Waste Management Facilities Phase 1. EIA Report.