雅虎香港 搜尋

搜尋結果

  1. testing of drainage works and submit all of the above documents to the BA within 7 days from the testing irrespective of whether the BA has inspected or tested the drainage works. Thus, registered contract ors should arrange with AP before submitting applications to the

  2. PNRC 11 Testing of Drainage Works Regulation 73 of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations More details

  3. 九廣鐵路公司鐵路防護措施《鐵路條例》《建築物條例》附表所列地區第3號. [此作業備考現予撤銷,請參閱 PNRC 14] 2005年3月. PNRC 59. 委任獲授權簽署人代註冊承建商行事及獲授權簽署人暫時缺勤. 2004年5月. PNRC 60. 滲水問題. 2010年12月.

  4. This Testing and Commissioning (T&C) Procedure aims to lay down the minimum testing and commissioning requirements to be carried out on Drainage Installation in Government Buildings of the Hong Kong Special Administrative Region (HKSAR).

  5. eform1.bd.gov.hk › lc › contentPNRC 11 Appendix A

    Application for Testing of Drainage Works. 《建築物 ( 衞 生設備標準、水管裝置、排水工程及廁所)規例》第73條. Regulation 73 of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations. • 請以正楷填寫,並在適當方格內加上『√』號。 填寫前,請細閱《注意事項》。 • Read the “Matters to Note” and complete in BLOCK LETTERS and tick the appropriate boxes.

  6. PNRC 11 Appendix A. The document you are trying to load requires Adobe Reader 8 or higher. You may not have the Adobe Reader installed or your viewing environment may not be properly configured to use Adobe Reader. For information on how to install Adobe Reader and configure your viewing environment please see http://www.adobe.

  7. This Testing and Commissioning (T&C) Procedure aims to lay down the minimum testing and commissioning requirements to be carried out on Plumbing Installation in Government Buildings of the Hong Kong Special Administrative Region (HKSAR).

  1. 其他人也搜尋了