  1. Regulation 73(1) of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations (B(SSFPDW&L)R) requires the registered contractors to apply to the Building Authority (BA) for testing of drainage works. 2.

  2. 2024年10月2日 · Mobile Form. PNRC Forms. Please refer to Practice Notes for Registered Contractors for the details of the related practice notes. HKSAR - Buildings Department.

  3. 2024年10月2日 · PNRC 11 Testing of Drainage Works Regulation 73 of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations More details

  4. 有sunken 要 Fill 輕石矢地方最好就做晒photo record and drain test, 雖然例冇講,但個個BD人收法都唔同,有啲又話要有啲又話唔洗。 但地渠嗰啲form就一定要,即係PNRC 11叫BD落嚟睇驗渠 (咁多年嚟我一次都未見過佢地會真係落嚟) ,再由AP簽張PNAP 157確認。

  5. eform1.bd.gov.hk › lc › contentPNRC 11 Appendix A

    Application for Testing of Drainage Works. 《建築物 (衞 生設備標準、水管裝置、排水工程及廁所)規例》第73條. Regulation 73 of the Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulations. • 請以正楷填寫,並在適當方格內加上『√』號。 填寫前,請細閱《注意事項》。 • Read the “Matters to Note” and complete in BLOCK LETTERS and tick the appropriate boxes.

  6. You may not have the Adobe Reader installed or your viewing environment may not be properly configured to use Adobe Reader. For information on how to install Adobe Reader and configure your viewing environment please see http://www.adobe.com/go/pdf_forms_configure.

  7. PNRC 11 Testing of Drainage Works – Building (Standards of Sanitary Fitments, Plumbing, Drainage Works and Latrines) Regulation 73 Apr 1993 PNRC 12 Overheight Vehicles – Road Traffic Ordinance, Cap 374 Jan 1990 PNRC 13 Pulverized Fuel Ash in ...

  8. This Testing and Commissioning (T&C) Procedure aims to lay down the minimum testing and commissioning requirements to be carried out on Drainage Installation in Government Buildings of the Hong Kong Special Administrative Region (HKSAR).

  9. Building (Standards of Sanitary Fitments, Plumbing, drainage works and Latrines) Regulation 73(1) requires applications for drain testing to be submitted to the Building Authority. Trenches should not be filled in until this period has elapsed. Drain tests are to be

  10. 無論建築事務監督會否 檢查或測試該 排水工程, 認可人士均須在 測試日起計的 7 天內,備妥排水工 程測試完成證明書,並向 建築事務監督呈交 上述所有文件。 因 此,註冊承建商 以載於附錄的標準表格向 建築事務監督提出申 請前,應先與認可人士作出安排,並把申請副本送交 認可人 士。 3. 《規例》第73( 6) 條規定,有關人士須預留 4 個工作 天. 1. 讓建築事務監督檢查和測試 排水渠 。 此期限屆滿前,不得 填塞坑道。 4. 檢測設備應具有 良好效能,而 進行測試的排水工程 應按所需斜度妥為鋪設,適當地鋪墊以及有足夠 承托。