雅虎香港 搜尋

搜尋結果

  1. 1. Typical Contents of the Traffic Impact Assessment (TIA) Report. 1.1 The TIA report should contain at least the following information which may be changed or revised (subject to TD’s latest requirements and guidelines): the name of the Agency which the road opening work belongs to;

  2. Traffic Impact Assessment & Day-time Ban Requirements for Road Works on Traffic Sensitive Routes Appendix 1 - Annex 1-Annex 2 Appendix 2 RD/GN/022

  3. 其他人也問了

  4. This Guidance Note contains a consolidated guidelines on these two requirements. 1.2 The requirements stipulated by ROWP are for utility works. Subsequently Highways Department (HyD) decided to follow the TIA requirement for in house works and to comply with the day-time ban requirement as far as practicable.

    • 156KB
    • 3
  5. project proponents to (i) conduct a Noise Impact Assessment (hereinafter referred to as “RTNIA” (Road Traffic Noise Impact Assessment)) and (ii) provide mitigation measures to the satisfaction of the Director of Environmental Protection (DEP) or other relevant

  6. Road Traffic Noise Impact Assessment Under the Environmental Impact Assessment Ordinance (This guidance note supersedes EIAO Guidance Note No. 12/2010 with immediate effect)

    • 352KB
    • 20
  7. Methodologies for Fisheries Baseline Surveys [GN 15/2023] Preparation of Fixed Noise Sources Impact Assessment Under the Environmental Impact Assessment Ordinance [GN 16/2023] General Notes for Applications under the Environmental Impact Assessment Ordinance (Chapter 499) Basic Principles of Environmental Impact Assessment Process [GN 1/2002]

  8. 2024年5月1日 · A traffic impact assessment (TIA) with use of visualization can be well-integrated with traffic engineering and management framework to coordinate solutions that optimize the performance, efficiency, and sustainability of the city’s transportation system. In this issue, TIA is briefly explained.