雅虎香港 搜尋

  1. 凍倉 相關

    廣告

搜尋結果

  1. 主頁 | 香港房屋委員會及房屋署. 綠置居2023 、 居屋 2023 、 白居二 2023. 主頁. 出售綠表置居計劃單位2023. 詳情. 出售居者有其屋計劃單位2023. 詳情. 白表居屋第二市場計劃2023. 詳情. 機構計劃. 2024/25. 詳情. 預算. 2024/25. 詳情. 2022/23. 年度年報. 詳情. 優質公共房屋建造及. 保養維修大獎2023. 詳情. 出售綠表置居計劃單位2023. 詳情. 最新消息. 新聞稿. 招標. 職位空缺. 刊物與統計數字. 28.03.2024. 委任房屋委員會委員. 27.03.2024. 房委會表揚優秀屋邨管理服務承辦商及前線員工. 27.03.2024. 房屋委員會將差餉寬免轉歸租戶. 25.03.2024.

  2. 2023年7月4日 · Since 2013/14, we have adopted specification for 6-litre dual flush water-closets for selected projects use. The facility can be used for dust-control and to wash the wheels of construction vehicles. The waste water is then properly treated to drainage standards.

    • Conducting Micro-Climate Studies and Air Ventilation Assessment
    • Adopting Low Carbon Building Design
    • Utilising Green Materials and Products
    • Environmentally Friendly Construction Practices
    • Promoting Electric Vehicles
    • Energy Efficiency in Buildings
    • Water Conservation
    • Mitigating Environmental Impacts
    • Noise Control
    • Air Quality Management

    Since 2004, we have been conducting Air Ventilation Assessment (AVA) and micro-climate studies in our design of new public housing developments to assess their impact on the neighbourhood environment using design tools such as computational fluid dynamic model and wind tunnel testing. Through these studies, we can optimise the environmental perform...

    We apply the Carbon Emission Estimation (CEE) method to estimate carbon dioxide emissions from buildings throughout their expected 100-year life cycle. This methodology enables the establishment of the benchmarks of emission level for a housing block and a housing estate throughout the project cycle stages to facilitate comparison and to set achiev...

    We have increased our utilisation of green materials such as Ground Granular Blast Furnace Slag (GGBS). As part of our current building contracts, we require that 35% of the cement used to produce precast facades and stairs be replaced by GGBS. We are also investigating the feasibility of using GGBS to build precast hard paving, partition walls and...

    We have developed various standards to better manage our innovative and environmentally friendly practices during the construction stage, such as:

    The HA has installed electric vehicles (EV) charging facilities in all new estate car parks to support the Government's Roadmap on Popularisation of Electric Vehicles. In our new indoor private car parks, 30% of parking spaces are equipped with EV chargers, while the remaining 70% are provided with EV charging-enabling facilities for future EV char...

    The Buildings Department issued “Guidelines on the Design and Construction Requirement for Energy Efficiency of Residential Buildings” (the Guidelines) in 2014. Following the Guidelines, we continue to improve natural ventilation and environmental performance in our new buildings. We also follow the Electrical and Mechanical Services Department (EM...

    Fresh water is used in new building construction, daily washing, flushing, and irrigation. We have adopted several measures in our new projects, such as using 6-litre dual flush water-closet suites in domestic premises to fulfil the water efficiency grading. We support the government’s water conservation campaign by assisting and facilitating WSD’s...

    To optimise the use of resources, felled trees are recycled at some of our developments. We set up on-site shredding and composting to reuse fallen trees as mulch. Some trees are chipped and composted with food and garden trash. We continue to engage the local community in our greening efforts. Tenants are invited to join our Action Seedling progra...

    Buildings near roads will be affected by traffic noise. We used acoustic windows, acoustic balconies, architectural fins and noise barriers in buildings to meet site-specific requirements. The second generation of precast acoustic balconies include a sliding screen in front of the balcony doors, noise-absorbing material in the balcony wall and ceil...

    To remove air pollutants, filters are installed in our contractors’ plants and machines. The HA also phased out 4 types of Exempted Non-Road Mobile Machinery in our construction sites with estimated value over $200 million in line with the Development Bureau’s implementation plan.

  3. 2020年11月30日 · 利用這工具找尋房委會各公共屋邨、商場,以及在居者有其屋/私人機構參建居屋計劃下出售的屋苑的位置及資料。,香港房屋 ...

  4. 5 天前 · 建築工程規格資料庫輯錄了用於新發展工程合約的建築物料及造工規格。 資料庫的內容會不時更新,並於每隔數年頒佈新的版本。 「建築工程規格資料庫 2022 版」 (SL2022) (初版) 於 2022 年 4 月正式頒佈生效,用於由 2022 年 6 月之後招標之房屋委員會新發展工程合約。 建築工程規格資料庫分作下列十個主庫: 下載. 建築工程規格資料庫 2018 版 (第1批次) 建築工程規格資料庫 2018 版 (第2批次) 建築工程規格資料庫 2022 版 (第1批次) 建築工程規格資料庫 2022 版 (第2批次) Specification Library,Business Partnerships,Resources,香港房屋委員會及房屋署.

  5. 2020年12月22日 · 清拆安置 | 香港房屋委員會及房屋署. 公共房屋. 照顧特殊需要. 清拆安置. 隨着寮屋管制及清拆職務由2006年4月1日起從房屋署移交地政總署後房屋署的職責只局限於協助安置受政府為騰出土地作發展或其他用途等清拆行動影響的合資格人士以及受天災和其他緊急事故影響的災民。 對於受清拆影響的居民的住屋安排,請參閱 公營房屋政策甲部第二章 。 常見問題. 1. 政府清拆我的寮屋時,有關居民可否獲得安置入住公共租住房屋 (公屋)? 受清拆影響的人士,須符合下列資格,才可獲安置入住公屋: 2. 受寮屋清拆影響的居民,可否用綠表申請資助置業計劃? 受政府清拆影響人士如符合上述入住公屋的資格,可向房屋署申請「綠表資格證明書」,以普通綠表資格申請購買居屋或居屋第二市場的單位以代替安置。

  6. 規劃及建造新屋邨的措施. 現有屋邨推行的措施. 辦事處推行的措施. 個案研究 : 節水創新 — 零灌溉系統. 節水創新 - 零灌溉系統. 氣候相關風險可能會對房委會的資產造成重大的影響。 為應對氣候變化,房委會必須提高其公共房屋的氣候適應力和可持續性。 由於預計暴雨和颱風將越見頻繁,房委會已研發完整體系,以緩解這些極端天氣帶來的影響。 零灌溉系統自2013年開發以來,一直作為重用雨水進行園圃灌溉的先驅。 它不但能節省灌溉用水,還同時減輕了城市排水系統的壓力。 自2016年,我們在所有新公共房屋項目中,於位置和面積合適的花糟均已使用這灌溉系統。 三個可持續系統. 零灌溉系統結合以下三種可持續系統來達到「彈性景觀」的概念: 1. 雨水收集系統. 作用. 收集和儲存雨水以備使用. 2.

  1. 其他人也搜尋了