雅虎香港 搜尋

搜尋結果

  1. RankGPWDLPts
    137277388
    237275586
    3372310479
    437208968
    5371961263
    6371791160
    7371761458
    8371761455
    93714101352
    103712121348
    11371391548
    123712101546
    13371371746
    14371281744
    15371391540
    16371091839
    1737892029
    1837682326
    1937592324
    2037372716
    曼聯
    般尼
    • 12th進球數目18th
    • 16th助攻18th
    • 6th射球17th
    • 1st撲救1st
    • 12th黃牌14th
    • 17th紅牌1st
  2. 唔想嘈,可以揀較靜嘅分體式冷氣,冷氣機分為兩部分:室內機負責送風,室外機則處理製冷。由於要安裝室外機,安裝或維修往往需搭棚,成本分分鐘同部冷氣價錢差唔多!為咗滿足香港人需要,有唔少冷氣供應商推出「窗口式分體冷氣機」,室外機體型細小,可直接安裝係放窗口式冷氣嘅冷氣機 ...

  3. 我們致力為客戶提供安全及可負擔的供電服務,可靠度逾99.999%達世界級水準,在 2020年至2022 年間,每年每客戶平均意外停電時間為5.7 分鐘,高於去年的 0.99 分鐘,這主要受元朗電纜橋起火事故影 響。. 若剔除元朗電纜橋起火事故的影響,其三年的平均值為 1.0 ...

  4. 1. 先開風扇 再開冷氣機 ,因為1匹冷氣機運行1小時已經相等於風扇運行20小時. 2. 調高冷氣機溫度,冷氣機溫度每調高一度, 可以節省3%能源. 3. 定期清洗冷氣機隔塵網, 消滅細菌以外, 還可以延長冷氣機使用壽命. 4. 採用人工智能裝置自動調節溫度,例如 Ambi Climate, 提升舒適度及節省能源. 即上中電 「度度賞」 ,無論窗口式定分體式都梗有一款啱你心水! 窗口式冷氣機. 分體式空調機.

  5. 1. New and old energy labels. The new energy label maintains 5 energy efficiency grades. Grade 1 products are most efficient (in green) while Grade 5 products are least efficient (in red). Starting from 2015, room air conditioners, refrigerating appliances and washing machines supplied by importers shall bear the “U1 energy label.”.

  6. As a business customer, you can obtain subsidy from the Electrical Equipment Upgrade Scheme (EEUS) to install or upgrade energy-efficient lighting or air-conditioning. The EEUS is designed for SME customers in particular. CLP Power has not authorised, appointed or partnered with any intermediary companies or vendors to sell or install eligible ...

  7. 想選購浴室寶,先要知「浴室寶三式」. 天花式:好處為氣流平均,但樓底需至少高12呎,而且觀感上配合假天花較美觀. 窗口式:港人最常用,窗口位,樓底較低家庭合用. 掛牆式:適合樓底較低家庭,但風管會較顯眼. 如果預算足夠,又想買個浴室寶長用,建議 ...

  8. We dedicate funding from the CLP Community Energy Saving Fund to to help commercial and industrial customers enhance their energy efficiency and reduce carbon emissions. CLP Electrical Equipment Upgrade Scheme. CLP Solar Grant Programme. CLP Retro-Commissioning and Retrofitting Training Upgrade Programme.